Rental equipment

Rentals stop
costing quietly.

Every rented light tower, heater and sea can on your sites, with what it has cost, what it adds to the PO, and an email before it renews. The field checks units in and out with photos; the office sees the money.

Rentals · on siteEstimates
UnitSiteRateOn siteAccruedRenews
LT-004Light towerNorth Bench · Pad 4$1,800 / 28 days19 days$1,221in 9 days
HTR-12Indirect heaterCamp 2$650 / week12 days$1,114in 2 days
SC-031Sea canLaydown$450 / month41 days$610in 20 days
An example register. HTR-12 renews in two days, so its owner and admins have already had the email.

Where the money goes

Every job has one.

The light tower nobody sent back

It finished its work three weeks ago. It's still on rent, renewing every 28 days, because nobody on site knew what it cost and nobody in the office knew it was still there.

The renewal you hear about from the invoice

A heater rolls into another period on a Tuesday and the first anyone hears is the vendor's bill a month later — long after it could have gone back.

Rented iron the client never pays for

The unit was on site and working, but it never made it onto a ticket. Or it made it onto two, and the client caught it.

From the truck to the return

How a unit moves through Pit & Rig.

  1. On site

    Checked in from the phone

    The foreman picks the type, types the unit number, takes a photo of the serial plate and one of its condition. Up to twenty-five units at a time, straight off the truck.

  2. In the office

    The burn, per unit

    Accrued is what it has cost so far, day by day at the rate in force that day. Committed is what you owe for periods already started. And if it went back today, the cheapest mix of day, week and 28-day rates says what the bill would be.

  3. Three days out

    A warning before it renews

    Owners and admins get one email listing what each renewal will add. The foreman who checked it in gets the same list without the dollars, asking whether it's still needed. Set a planned return, or mark it kept, and the warning stops.

  4. Every day it works

    Billed through the ticket

    Link the unit to the PO's equipment rate and it appears on the foreman's ticket. It can't be billed for a day it wasn't on site, or twice for the same day on two tickets.

  5. When it goes back

    Off-rent and check-out

    Off-rent stops the clock; check-out records the return and damage photos and the final meter reading. Swap a unit or move it to another site and its rate and PO links follow.

The details

What's in it.

Rates
Hour, day, week, 28-day or monthly, with vendor presets the field picks up automatically.
Foremen never see money
Not a hidden column — the server never sends them a rate.
PO exposure
What rentals have billed on a PO, what's pending, and what the next thirty days will add against what's left.
Reports
The register and its burn in Excel and PDF, filtered by site, vendor or status.
Estimates, labelled
Every figure says it's an estimate. Fuel, weekend rates and damage waivers vary by contract; the vendor's invoice is the real number.
Included
On every contractor plan — Operations and Pro.

Coming next: QR tags and serial-plate scanning. Today the unit number is typed.

Send the light tower back on time.

Rentals are part of every contractor plan, next to the tickets, POs and invoices they bill through. Start a free trial and check in the units already on your sites.

See plans & pricing
01 / CONNECT THE DOTS

THE WORK MOVES.
THE RECORD FOLLOWS.

A ticket shouldn’t be a dead end.
See how one day in the field becomes
one clear record in the office.

INTERACTIVE WALKTHROUGH

This is a sample project. Try the controls.
No account. No real data. Just the flow.

P&RNORTHLINE / PROJECT 024LIVE DEMO
FIELD TICKET / FT-0241

One shift. Everything in it.

Draft
PROJECTNorthline · Pad 04
SHIFTDay shift / Sample
CREWDrilling crew A
8 hours

Drag to change the hours. Watch the ticket update.

THE WORKQUANTITYAMOUNT
Field crew2 people · $85 / hour each16 hrs$1,360.00
Drill rig$240 / hour8 hrs$1,920.00
MaterialsDrilling consumables1 lot$320.00
SHIFT TOTALCAD · before tax$3,600.00
Before the shift. The safety tailgate.FLHA-0241 · Sample assessment3 / 4CREW SIGNED
Northline · Pad 0406:45 · Day shift · −8°C

Set up. Check the ground. Talk it through.

The hazards, controls, and crew acknowledgement stay with the day’s work. Open the sample, then add yourself to the crew.

Moving equipment4 → 2

Review the exclusion zone, spotter, and radio check before the shift.

Ice underfoot3 → 1

Review access routes and confirm the walking surface has been treated.

Changing site conditions3 → 1

Stop and reassess with the supervisor when the work or conditions change.

Illustrative risk scores: before → after controls, on a 1–5 scale.

MEETING POINTSite office · North gate

Emergency arrangements are reviewed with the crew at the briefing.

Jordan M. · SupervisorAlex R. · OperatorSam K. · DrillerYour spot on the crew

Example only. No attendance or safety record is created.

The details stay together.

Illustrative rates. Demo actions never send an email or create real records.

01 — FIELD CAPTURE1 / 3
Page one of the Pit & Rig Fieldbook overview: The work is done. So why aren’t you paid yet?
FREE PDF2 PAGES · 200 KB
THE FIELDBOOK OVERVIEW

The whole pitch.
Two pages.

Where field-ticket money leaks, how a ticket goes from the field to paid, and what it costs. Five minutes to read, no sales call.

  • Where your money leaks, and the fix
  • From the field to paid, in four steps
  • What’s built in, and what it costs